Tankless Swap

Retrofit Scope Details

Gas Supply, Dedicated Venting & Electrical Panel Checklist

Match your written contractor questions to whether you are installing a gas or whole-home electric tankless unit.

Tank-to-Tankless Swap Gas, Venting & Permit Change-Order Checker
1. Project & Input Parameters
2. Interactive Verification Checklist

Gas vs. Electric Retrofit Focus Areas

Retrofit Area Gas / Propane Tankless Whole-Home Electric Tankless
Energy Supply Check Licensed gas supply & meter BTU verification Licensed electrical service & main panel load review
Exhaust & Drain Dedicated rated vent run + condensate drain/neutralizer No combustion vent; verify wet-location mounting clearances
Maintenance Prep Isolation flush valves + inlet screen access Isolation flush valves + hard-water scale check
Close-Out Scope Plumbing/gas permit + old tank haul-away Plumbing/electrical permits + old tank haul-away

Frequently Asked Questions

Do condensing gas tankless units need a condensate drain?

Yes. High-efficiency condensing models produce mildly acidic condensate water that requires a proper drain route and often a neutralizer cartridge per local plumbing code.

Should old tank removal be listed explicitly on the contract?

Yes. Confirming drain, disconnect, and haul-away in writing prevents an abandoned old tank being left in your garage.